Section 23 22 13 - STEAM AND CONDENSATE ... - VA Vendor Portal
300, 400, 600, 900, 1500 and 2500 .... 125 pound cast iron, ASME B16.4, may be
used in lieu of malleable iron, except for steam and steam condensate piping. ....
G. Manual Radiator/Convector Valves: Brass, packless, with position indicator.
HYDRONIC PIPING - (eCMS) Vendor Portal
300, 400, 600, 900, 1500 and 2500 .... 125 pound cast iron, ASME B16.4, may be
used in lieu of malleable iron, except for steam and steam condensate piping. ....
G. Manual Radiator/Convector Valves: Brass, packless, with position indicator.
SECTION 09900
Pressure fittings ..... Body: Cast iron, ASTM A126, Class B. Malleable iron, ASTM
A47 electro-plated, or ductile iron, ASTM A536, Grade 65?45?12 electro-plated. b.
.... I. Manual Radiator/Convector Valves: Brass, packless, with position indicator.
basic - Chrysler
products to be utilized on site. 1.5 Submit two painted .... Paint interior surfaces of
air ducts [and convector and baseboard heating cabinets] visible through grilles
and louvers with one coat of flat black paint to visible surfaces. Paint dampers ...
section 15762 - NY.Gov
convector covers, covers for finned tube radiation, grilles, and similar
components are in place. Extend coatings in these areas as required to .... (3.785
L) or 1 case, as appropriate, of each material and color applied. PART 2
PRODUCTS.
Specifications
charts, specifications and installation instructions for Convector Radiators. 1.03
QUALITY ... Mechanically bond tubes to cast iron headers, or silver braze to cast
bronze headers; each header complete with tappings as required. Design ...
APTA Bus Procurement Guidelines 2011 - American Public ...
drawings to ensure that required mechanical and electrical equipment is
adequately indicated. .3 Reinforce infill panels to receive [convector cabinet] [
finned tube radiation cabinet] [electrical component] brackets and attachments as
indicated.
rfqc document - word
evaluating the Proposal, and the electronic version is provided for the Agency's
administrative convenience only. A Proposal ...... Sufficient floor-level heaters
shall be provided that evenly supply convector air across the length of the bus.
Control ...
1 - SEMBICON Systems
is mutually agreed by the parties hereto in case of the Contractor's failure to
complete the construction within the time specified the Owner will be damaged
thereby. The Contractor shall commence performance of its activities on the site
under ...