INF - unece
1.4.2.2.1 (d) Replace ?the date of the next test? with ?the deadline for the next test?
. ... 60 litres water capacity or less, until the next periodic inspection but no later
than 30 June 2018. ...... 3269 (twice) and 3473, in column (3b) replace "F1" with "
F3". ...... 5.5.3.7.1 Documents (such as a bill of lading, cargo manifest or CMR/
CIM ...