Integration and Test Subsystem PDR Report - GLAST at SLAC
Integration, Facilities, Configuration, and Test ..... ground test are properly
identified, documented, assessed, tracked and corrected in a controlled and
approved manner. ..... We have requested 2 months of beam from SLAC in Jan-
Mar 2004. .... Figure 22 This is the Balloon Flight Engineering Module (BFEM)
L1T trigger rate ...